The slopes used to stabilize the ground around this bridge were cast in place slabs. Construction involved different challenges, such as working on a sloped surface, pouring using very low plasticity concrete, or low slump, and imprinting sections of the slab with a stone pattern and colored concrete. The end result corresponds to the plans and specifications and contributes to the modern look of the bridge.