Bridge Slope

Bridge Slope

About the Project

The slopes used to stabilize the ground around this bridge were cast in place slabs. Construction involved different challenges, such as working on a sloped surface, pouring using very low plasticity concrete, or low slump, and imprinting sections of the slab with a stone pattern and colored concrete. The end result corresponds to the plans and specifications and contributes to the modern look of the bridge.

Project Details

  • Name of Group or Owner
    Municipal Infrastructures
  • Location
    Bridge Slope for the Nose Hill Dr NW Bridge crossing over Stoney Trail NW.
  • Colour Options
    Shadow Grey
  • Concrete Patterns
    Ashlar Cut Slate
  • Release Colours
    Rich Black