This home owner's concrete driveway, wall and slab had been left unfinished by the previous contractor and he needed some one reliable to finish the job. At the highest the wall is 14 feet high and 12 inches thick. Structural integrity of the formwork is a crucial aspect of the construction. Poor workmanship or under-design of the formwork can cause failure or deformities under the pressure of the concrete. This project is still in progress and the pouring of the driveway slab will commence when the ground thaws this spring.