Breadcrumbs

Brewster Bridge

Brewster Bridge

About the Project

Brewster Bridge was a replacement bridge as the original bridge was washed out during the 2013 floodings. Tayo Construction executed the concrete framing and pouring; created decorative concrete wall abutments, and installed the metal girder infrastructure. The precast deck was flown in and placed into position, and each piece weighs almost 3000 kilograms and takes a steady hand and great communication from all partners to install safely. The original bridge was 13m long, but because of the impact of flooding the new bridge now spans 36m. Limited access and equipment restrictions made for a challenging project.

 

 

Project Details

  • Name of Group or Owner
    Parks Canada
  • Location
    Sunshine Village

Get in Touch

Any questions about our services? Looking for a job opportunity?
Call us at 403.921.6612 or email us contact@tayoconstruction.com
or simply send your inquirery through the form.